HOME

ABOUT
 

GOING GREEN


 PAST PROJECTS


CURRENT PROJECTS

AWARDED PROJECTS

DESIGN/BUILD

STAFF

EMPLOYMENT


CONTACT US

FEEDBACK/QUOTE

 

 

                                                 

~ Green Construction ~
 

 

Recycled Materials

 

- The steel components of the Pre-Engineered Metal Buildings we use are made from a 85% percentage of recycled steel

 

- At the end of the building's life span, all the steel used in the building is recyclable

 
 

 

Efficient Design

 

- Pre-Engineered metal buildings are designed to optimize steel usage, reducing the amount of raw materials required, while maintaining the highest level of structural integrity

 
 

 

Energy Efficiency

 

- All buildings constructed by DeGraff Development meet the Title 24 Energy Compliance Guidelines

 

- Our Pre-Engineered Metal Buildings are fabricated here in the Central Valley, reducing the vehicle emissions involved in delivery 

Lodi ~ Stockton ~ Tracy ~ Sonora ~ Modesto ~ Oakdale ~ Turlock ~ Atwater ~ Merced
Copyright @ 2008 DeGraff Development, Inc. All Rights Reserved